close x

Facilities

LADOL offers a wide variety of well-equipped facilities based on and around its large quay, including offices,
first-class accommodations, storage facilities, sewage and water treatment, and power generation. The flexible plan calls for increasing both the size of the platform and the facilities it houses as demand grows.

Extensive, Modern, Customized Logistics and Personnel Suppor...

  • 200m quay wall with deep 8.5m draft.
  • The highest load-bearing platform in Lagos Harbor: 25ton/m2 in specialized areas
  • 10 ton/m2 load-bearing reinforced concrete hard standing for fabrication/assembling/testing/load out
  • Ducts/piping built into the quay to deliver products directly to vessels
  • Fuel tanks (under construction)
  • Large, modern warehouses and workshops
  • Laydown areas with open storage
  • Office buildings (fully furnished)
  • Power house
  • Sewage treatment plant
  • Water treatment plant (delivers water through quay at 60m3/hour)
  • 24-hour power, light and security
  • Operational canteen
  • Hotel with swimming pool, bar, gym and international restaurant
  • Fiberoptic cabling & Internet throughout the free zone
  • Passenger jetties in Ikoyi and Apapa

Other Facilities

Future Facility Developments in LADOL Free Zone will be determined by the requirements of the enterprises that set-up in LADOL Free Zone as well as oil and gas companies using the logistic and engineering services of LADOL.

Featured Facilities

  • Fuel Bunkering
  • Manufacturing Facilities
  • Shipping Agency
  • Heliport and Helicopter hanger
  • Ferry Port
  • Hotel
  • Restaurant
  • Industrial and Domestic Waste Processing Facilities
  • Training and Conference Facilities